Home > Projects > Manufacturing > Tyco Electronics

Integrated Manufacturing Facility – NUTEC provided full service architecture and engineering for a new 255,000 sq. ft. Integrated Manufacturing Facility (IMF) to consolidate manufacturing operations from three facilities. The new building contains 40,000 sq. ft. of office space and 215,000 sq. ft. of manufacturing space. This IMF houses stamping, plating, and extrusion molding systems.

Building #172 – This full service design project entailed conversion of an existing 58,500 sq. ft. stamping plant into an Integrated Manufacturing Facility incorporating stamping processes, plating, injection molding, and assembly areas.

Building #149 – NUTEC provided full service architecture and engineering to create an Integrated Manufacturing Facility. Additions of 6,000 sq. ft. and 35,000 sq. ft. were constructed to the 19,000 sq. ft. former die-casting facility. Industrial processes include die-casting and barrel plating.

Engineering Building #5 – HVAC, electrical, plumbing, fire protection, and structural engineering were provided for a new two-story 190,000 sq. ft. office/manufacturing facility for AMP’s Strategic Business Group. This multi-functional building houses offices, development and testing laboratories, clean rooms, and production prototyping.

© Copyright 2024 Privacy Policy Sitemap